San Giovanni Battista Hospital – Foligno
San Giovanni Battista Hospital - Foligno CLIENT Umbria 2 Local Health Authority CONTRACTOR Temporary Joint Venture (RTI): Rosa Edilizia S.r.l…
CLIENT
Zara 4 Condominium
CONTRACTOR
Joint Venture: Edilsystem srl (Lead Partner) – Azeta Costruzioni S.r.l. (Partner)
SUBJECT OF THE CONTRACT
Seismic isolation work at the base and foundation reinforcement
PROJECT LOCATION
Potenza (PZ) – Via Zara 4
PROJECT PERIOD
2023–2024
The seismic retrofit of the residential building located at Via Zara 4 in Potenza involved the implementation of highly specialized structural solutions designed to improve seismic performance and reduce the stresses transmitted to the superstructure.
Edilsystem S.r.l. directly and comprehensively managed the installation of the seismic isolation system at the base by installing “sliding pendulum” isolators, performing a controlled cut of the existing columns, the temporary transfer of vertical loads, and the subsequent safe return of the structure to service.
At the same time, foundation stabilization work was carried out through the installation of micropiles and the reinforcement of the plinths, as well as the widening and retrofitting of the reinforced concrete piers, incorporating steel structures and high-performance structural concrete.
The project, carried out in accordance with the Technical Standards for Construction and the most advanced seismic retrofit procedures, has significantly improved the building’s dynamic behavior while preserving its structural integrity and functionality.