CLIENT
AG JV – Acciona Ghella Joint Venture

SPECIALIST SUBCONTRACTOR
Edilsystem S.r.l.

CONTRACT SCOPE
Specialist tunnel waterproofing works for stopping pressurised water inflows and permanently sealing water infiltration

PROJECT LOCATION
Oslo – Norway

WORKS PERIOD
2018 – 2019

Description of the Works

Specialist works carried out as a subcontractor within a major underground infrastructure project in Oslo, aimed at the immediate stopping of substantial water inflows and the permanent sealing of water infiltration through the tunnel lining.